Here are a few pictures of a kitchen remodel completed in July 2009. Keep in mind that these are not the ‘staged’ pictures, but pictures we took while waiting for the electrical and plumbing inspection to be completed. It should take the homeowner a week or so to put her kitchen back together and start enjoying her new conveniences like the corner lazy susan and full extension drawers with the non-slam hydraulic.

Project Description: We provided entire kitchen design and cabinet layout, wall removal, hardwood floor repair and refinish, cabinet installation, electrical, plumbing, general carpentry, designed a new lighting plan, and helped homeowner select all material such as cabinets, countertops, appliances, plumbing fixtures, and tile.

Cabinets: Omega cabinets in Cherry wood with autumn stain on the Madrid door style.

Appliances: GE

All tile, lighting fixtures, and hardware were provided by homeowner.

Here are the before pictures-

Odell%20003

Odell%20002 Odell%20005

Odell%20006

During pictures-

Many things happened during these stages. One major wall was removed to open the space; a pantry/closet area was removed, along with all the soffits in the room. You can see by the photos below that we had to patch into their existing oak floor where the wall was removed. We also ran into lots of water damage along the window wall caused by a leaky exterior window. We had to reframe that entire wall and replace the window and casing.

IMG_1987 IMG_1992

IMG_2036

IMG_2038 Pictures of the kitchen as of today-

IMG_2191

IMG_2177

IMG_2179 IMG_2178 IMG_2187

IMG_2188

IMG_2190

Granite Countertop color: Black Mosaic