Here are a few pictures of a kitchen remodel completed in July 2009. Keep in mind that these are not the ‘staged’ pictures, but pictures we took while waiting for the electrical and plumbing inspection to be completed. It should take the homeowner a week or so to put her kitchen back together and start enjoying her new conveniences like the corner lazy susan and full extension drawers with the non-slam hydraulic.
Project Description: We provided entire kitchen design and cabinet layout, wall removal, hardwood floor repair and refinish, cabinet installation, electrical, plumbing, general carpentry, designed a new lighting plan, and helped homeowner select all material such as cabinets, countertops, appliances, plumbing fixtures, and tile.
Cabinets: Omega cabinets in Cherry wood with autumn stain on the Madrid door style.
Appliances: GE
All tile, lighting fixtures, and hardware were provided by homeowner.
Here are the before pictures-
During pictures-
Many things happened during these stages. One major wall was removed to open the space; a pantry/closet area was removed, along with all the soffits in the room. You can see by the photos below that we had to patch into their existing oak floor where the wall was removed. We also ran into lots of water damage along the window wall caused by a leaky exterior window. We had to reframe that entire wall and replace the window and casing.
Pictures of the kitchen as of today-
Granite Countertop color: Black Mosaic
May 29, 2018 at 12:23 AM
This is a brilliant blog! Thanks for sharing.
Kitchen Remodel Cabinets
Best Kitchen Ideas
Bathroom Remodel
Flooring Installation